Chapel Church
This project was the MEP/FP design for a new construction church with a large sanctuary,
fellowship hall and meeting/classrooms. The HVAC system consisted of a ground mounted
packaged unit for the sanctuary and split system condensing units with indoor gas fired air
handlers for the remaining areas. The general lighting system used fluorescent downlights in
the sanctuary and fellowship hall and fluorescent 2x4 fixtures throughout the remaining areas.
Coordination was required for the theatrical lighting locations and power connections and the
A/V system locations and power connections. A manual fire alarm system with occupancy
notification was designed throughout the building which also monitored the sprinkler system.
Location:Franklin Twp., Warren Cnty, NJ
Building Size:12,000 S.F.
Year Completed:2012
Covenant Church
This project was the MEP/FP design for a 35,000 S.F. new classroom and 900 seat worship
center. The initial mechanical system study concluded the new addition would be most
efficiently heated and air conditioned by a variable refrigerant flow (VRF) system along with a
dedicated outside air (DOAS) system. The VRF and DOAS systems were later value engineered
out and replaced by conventional pad mounted gas fired air conditioning units. Coordination
with the church’s audio, video and acoustics consultants where required for the HVAC system
designs. The general lighting system used fluorescent downlights in the sanctuary and
fellowship hall and fluorescent 2x4 fixtures throughout the remaining areas. Coordination was
required for the theatrical lighting locations and power connections and the A/V system
locations and power connections. A manual fire alarm system with occupancy notification was
designed throughout the building which also monitored the sprinkler system.
Location:Buckingham Township, Doylestown, PA
Building Size:35,000 S.F. addition and 5,000 S.F. renovation.
Year Completed:2019
Living Hope Community Church
This project consists of the renovation of 15,000 S.F. of an existing church. The renovated areas
originally consisted of a fellowship hall, small kitchen, classrooms and an open courtyard area.
The renovation utilized the open courtyard area to provide new classrooms while the existing
noted areas were renovated with new HVAC, lighting and A/V systems. The electrical service
and associated life safety generating were sized for the renovation and for a future 32,000 S.F.
addition.
Location:Perkasie, PA
Building Size:15,000 S.F. renovation of a 20,400 S.F. building
Year Completed:2019